The journey

The build log.

An orchard, documented as it happens — milestone by milestone, from bare land to first harvest. Newest first.

Milestone · June–July 2026

Shaping the land: the terraces go in

The most visible transformation yet. Excavators have moved onto both blocks and are cutting level terraces into the slopes — wide, stepped benches that follow the contours of the hillside.

This is what high-density orcharding looks like before the trees: every future row needs a level, stable bench so irrigation runs evenly and every tree sits on the same footing. The valley's older orchards below make a fitting backdrop — the old way and the new way, in one frame.

Two excavators working on freshly cleared ground at Highland Orchard, orchard belt in the background
Machines on the upper block — June 2026
Stepped earth terraces cut into the hillside
The stepped benches taking shape — July 2026
Milestone · Summer 2026

Water infrastructure finalized: two tanks and a keeper's unit

The orchard's water system is now fully designed and specified: two reinforced-concrete storage tanks sized for the estate at full planting, and a 500 sq ft keeper's unit so someone is on site year-round.

The sequencing is deliberate. M9 high-density trees depend on reliable irrigation — so water storage gets built before the first tree is ordered, not after the first dry spell. Detailed drawings and bills of quantity are done; construction is the next step on the ground.

Construction photos will appear here as the tanks go up
Milestone · Summer 2026

Fencing the perimeter: specification locked, vendors at the table

The full fencing specification for the ~665-metre perimeter is finalized: chain-link fencing with high-coverage privacy netting, protecting both orchard blocks as one secured estate.

We put the work out to competitive bidding against our own independently-built cost benchmark — and held the line on specifications. One early bid was rejected on a materials shortcut (annealed wire where the spec demanded better) — a small detail, but the whole point of writing a specification is refusing to quietly compromise it.

Milestone · 2026

Planting material: certification over claims

Before buying a single sapling, we built a sourcing discipline: every batch of M9 planting material must be verified through SKUAST-K and the government horticulture network — paperwork first, promises second.

Kashmir's high-density boom has flooded the market with "imported" material of uncertain origin. Planting the wrong trees is a mistake you only discover three years later. Our checklist exists so we never have to find out.

Milestone · The beginning

Land secured: two blocks near Pattan

Highland Orchard begins with two adjoining blocks of land — North and South — near Pattan in Baramulla district, in the heart of North Kashmir's apple belt. The perimeter was surveyed and mapped at roughly 665 metres, and the planning began: fence it, water it, then plant it.

North Orchard on the map → · South Orchard on the map →

Green spring hillside at Highland Orchard under a blue sky
The land as we found it — spring 2026
Grassland slope and young trees at the Highland Orchard site
The lower slope, before any earthworks

Next milestones

Fencing completion · tank construction · irrigation lines · first planting.
Each will be documented here when it happens.